Asbestos Floor Tile Removal
Asbestos Floor Tile Removal in Operational Store
Summary
Cleanfield employees mobilised to site on Day 1 of the project in their high sided tip truck with all necessary tools and equipment on board. Upon arrival contact was made with the store’s Project Manager where we ran through how we were to remove the asbestos tiles minimising any potential contamination of stock within the store. Works quickly commenced after allaying any concerns the store’s Project Manager may have had.
About the job



Challenges
The main challenges identified on this project were:
- Segregating operational areas of the store from the asbestos removal works area eliminating the possibility of asbestos contaminating these areas.
- Removing the 250m2 of carpet and previously unidentified 40m2 of asbestos tiles within the same amount of time to minimise disruption to the store
Solutions
By hanging black polythene plastic at the boundary to our works area, we were able to eliminate the possibility of airborne asbestos escaping our works area and potentially contaminating stock in operational areas of the store.
By employing specialised equipment to help us remove the asbestos floor tiles, we were able to ensure the extra carpet and asbestos tiles were removed within the allowed time frames. Having a diligent, hard working crew greatly increased the chances of completing the extra works on time.
Results
At the end of the day, we ended up with one happy client and one happy tenant. All works were completed on time, on budget and with minimal disruptions to the store.